Friday, November 12, 2010

Forward sub-floor fit up










On Saturday, Sam and I spent some time on the boat installing the tank hold downs. Then on Sunday,Sue and I fit up the plywood sub floor in the forward part of the main cabin. As in the rest of the boat, the framing under the floor forms the supports for all the various access hatches.

No comments:

Post a Comment