Monday, April 12, 2010

Names and Paint?






So, we'd like to get some input on a couple of names for the boat. We'll be documenting the vessel with the US Coast Guard and need to make a decision soon... the obvious one is "Koloa", which is the name we were thinking of when we started this blog. Its the name of a native Hawaiian duck. Since our boat design is based on the Diesel Duck line of Troller Yachts designed by George Buehler, it seems to fit. The other one we have been thinking of is "Kama Hele", which means traveller in Hawaiian. It has a nice ring and we like the translation.
Here are some pictures of some different paint ideas we've been playing with. Let us know what you think... The last one is compliments of Sam. If you have any input on names or paint schemes, send them to Sue at: floatingsue@gmail.com

Sunday, April 4, 2010
















Here's some recent pictures that show the current "state of the project"...
Finally finished all the fuel tank plumbing. We designed it to be all hard-piped with flexible connections at the fill, return, and supply manifolds. This was a lot of work and took a lot longer than we anticipated. The end result of all this crazy plumbing is in the pictures of the aft deck where you can see the fuel containment set-up, with all fuel vents and master fill pipe terminating at the aft deck behind the wheelhouse. I made up a lightweight anchor mock-up so we could experiment with different anchor roller geometry. The roller assembly will be welded up from some very heavy 3/4" by 6" 316 stainless flat-bar stock, so we have to get this right the first time. should be putting the real thing together in the next week or so. Had a visit from our friends John and Kari from Seattle. They drove us all over the Seattle area last year looking at boat designs. Nice to see them again. Also Casey from CS Marine lent us some boat stands so we can start cutting off the welded hull supports and get the plating cleaned up for paint.  Thanks again Casey...

Tank Tops







Been awhile since I've had time to sit down and organize pictures but we've been plenty busy finishing the seemingly endless "completing of hot-work" list. We are trying to get any and all welding and grinding done before we paint, and it seems that every time I step back, some new little welding or drilling detail pops up that I hadn't thought of. I have a lot of pictures so I'll do two installments... 
First is drilling the tank tops. Each compartment of our below deck fuel tanks has to have an inspection hatch for accessing the tank interior for maintenance and cleaning if that ever becomes necessary. We have 14 of these hatches that needed to be drilled for the studs that will bolt them down. This added up to about 470 5/8" holes in 5/16" steel- another monumental drilling project. Fortunately I was able to use a drill press for these, and drill a few hatches at a time by clamping them together with a master template on top. Still, each hatch weighed about 50 pounds, and it was a workout just moving them around and up into the boat.

Tuesday, March 9, 2010

Pipe fitting













Here's some pics from the past couple of weeks. Been busy working on fuel tank plumbing (vents, fills, supply, cleanouts, etc.) for our six tanks. Pretty involved job. We are done with the production welding on about half of the pipework and I should have all the fit-up work done on the rest this weekend. These are some pics from early in the process... its like a big complicated three dimensional jigsaw puzzle (with a lot of rules) but its slowly coming together. Also finished final drilling for ports, hatches, and steering gear. 

Saturday, February 20, 2010

Railings done, rudder fit-up, through hulls












All the hand-rails are finished and they came out very nice. Also fit-up the rudder and welded the pintle bearing support (this supports the lower end of the rudder). Alignment is dead-on, so we seem to have ended up with a good straight hull. We welded on pad-eyes on the centerline,  fore and aft of the rudder and drilled two corresponding lifting points on the rudder itself. You can just make them out in the rudder photo. By hooking up a chain hoist to each one you can crank the rudder right up into place with no drama... this will be very handy for future maintenance as the rudder weighs well over 200 pounds. Also finishing up the through hulls... we have  316 Stainless 1.5" fittings (well above the waterline) for each compartments bilge pump- 4 total. There is a 2" schedule 80 pipe discharge at the waterline for the engine driven bilge/fire pump (which I am still looking for), and another 2" schedule 80 pipe for grey and black water discharge (offshore only) below the waterline. Also fabricated a seachest inlet using 3" schedule 80 pipe. Schedule 80 refers to pipe that has a thicker wall than normal (schedule 40) pipe. All the waterline and below waterline through-hulls have a welded flange inside the boat that is bolted to a 316 Stainless flanged ball valve... all pretty standard commercial boat stuff. Jesus is understandably eager to get on with the prepping and painting so my focus in the next week or two will be to finish designing and fabricating anything and everything that gets welded to the boat. The main items are: footings for the masts, misc pad-eyes for the rigging, some misc deck vents, fuel tank plumbing, and an anchor roller. Speaking of anchors... we received our 120 lb Rocna anchor. By all accounts we've heard, this is a really good design for cruising- known for its fast setting ability in many different types of bottoms. Look forward to giving it a try.  -PB

Thursday, February 18, 2010

More railings, cowl vents, and hatch fit-up









Work on the railing continues. Originally the handrails were spec'd to be 1.5" pipe. After thinking about it (and checking the rails on different boats for "hand feel") we changed it to 1.25". Now that the rails are on, I definitely feel that we made the right choice. The 1.25" pipe feels and looks just right. This was one of hundreds of little decisions that we've made in past months. These are the kind of things that keep me up at night... its no fun to re-do things in steel once they are purchased and welded up so I find myself spending ridiculous amounts of time worrying about these kind of details. So far, I'm happy with the results of most of the decisions that we've made. 
Mark, who owns the first diesel duck (from which our design originates) came up with some excellent surplus cowl vents that have the right salty look for our boat. We cut them down a bit so they wouldn't impede our visibilty from the wheelhouse and I think they will and a lot of air circulation below decks which is key to being comfortable long term on a boat. They also look neat.