Our good friend and neighbor Dave was kind enough to spend his weekend helping us with some more carpentry. Dave's specialty is plumbing, but he has a good handle on all the trades. Having some outside help was a rare treat as we have been doing almost the entire fit-out by ourselves to date. Dave is looking at starting his own boat building project this year (composite construction catamaran) and a weekend on our project hasn't scared him off... he is very skilled and efficient and it was a pleasure having his help.
We knocked out the side-shell planking in the galley area and the guest cabin forward. Closing up the guest cabin area required the installation of some plumbing for the fill and vent for one of our water tanks. This gave us a chance to dig into our big box of pex tubing and fittings that had been sitting in storage for the last year. The first line we ran was one inch pex for the water tank #1 fill. Pex is great stuff but definitely a challenge to work with in this (larger, more rigid) size. Other than the water fills, the rest of the pex plumbing on the boat will be 3/4 and 1/2". After starting our plumbing wrestling with the 1", those smaller sizes should be a piece of cake. We have two more sections of side-shell planking, then we'll be switching gears and starting on the plumbing for the potable water, raw water anchor wash-down, black and gray water (toilets and drains), and hydronic heater plumbing. Started the install of the engine room located pumps, filters and manifolds in preparation for the plumbing work coming up... I think we'll be playing with this part of the project for at least a couple of weeks. What are you up to next week Dave?
Monday, May 14, 2012
Monday, May 7, 2012
Finishing stairs and dinette platform
Subscribe to:
Posts (Atom)