Rubber rub-rail is now installed around the swimstep. This will
provide some protection for the aft corners of the hull, and also make for nice
fendering when we have a skiff tied off on the stern. We had welded 1/2" Stainless studs around the stern way back when we built the hull, and fortunately the rub-rail fit up pretty well. I'll probably go back and fill some of the gaps at the corners some black 5200 sealant before I call it done.
Saturday, September 10, 2011
Forward Cabin Ceilings
Most of the past couple of weeks have been spent installing
the mid and forward cabin overhead planking, electrical and lighting. We're using the same beadboard that we used in the aft cabin. Pretty
straightforward, but a lot of square footage and a lot of lights to install.
Like the aft cabin, we are using LED lighting and some nice fixtures that we
got on closeout special from IMTRA. Galley/dinette and sitting area are on
dimmers which work very well. The dimmers, along with most of our other
lighting stuff, is from Jeff at MarineBeam. He’s been very helpful and I definitely
recommend them. Last weekend we brought our cat up for a visit. It took here
about 10 minutes to find a way to crawl under the floor into the bilges and
that where she stayed for the first 6 hours or so. Eventually she came out and
once she got used to the sounds and smells of the new boat she settled right
in.
Published with Blogger-droid v1.6.6
Subscribe to:
Posts (Atom)